PEAK FORREST CANAL
CLIENT:
BALFOUR BEATTY RAIL
SCOPE OF WORKS
Gritblast and Painting to Canal bridge, prepared to SA2 ½ and protective coatings to M34 RT98 specification. Full encapsulation required.
In addition we undertook steelwork repairs, brickwork repairs to the abutments and minor de-vegetation works.
CHALLENGES
Working over water necessitated containment to prevent pollution of the watercourse. Safety of operatives was paramount during these works. A safety boat was required. In addition we were required to mange passing canal traffic.